• Proven location strategies and development methodology insure optimum site selection for the users.
  • Industry-leading team of design and construction professionals focus on specific customer requirements.
  • 90 MW critical capacity campus, with dedicated on-site Oncor substation
  • Optimal site away from flight paths, railways and FEMA 500-year flood plain
  • Dedicated, on-site substation pre-designed to support the full capacity of the campus
  • 100% renewable power available at competitive transmission rates
  • Closed-loop chillers enhance WUE
  • Network-rich environment with a strong mix of local, long haul and dark fiber providers
  • < 1 ms roundtrip latency to major carrier hotels
  • Designed to meet or exceed Texas State Data Center Sales Tax Exemption program size and capital investment requirements
Get more information

Related resources