• Up to five new buildings will support up to 200 MW across 1.5 million data center square feet.
  • Three out of the new buildings, 120 MW, remain available for new tenant deployments.
  • On-site dual-fed breaker and a half CPS substation, with 2N configuration to each building.
  • Strategic location, positioned within a nationally competitive energy market.
  • Zero water use cooling systems (WUE=0.)
  • Data halls designed to accommodate both air and/or liquid-cooled IT.
  • Supports advanced digital infrastructure by incorporating the latest technologies for enhanced reliability.
  • Secure campus configuration allows for individual to secured perimeters per building, or for the combination of lots.
  • Robust network connectivity.

Explore our San Antonio Campus

Stream’s third San Antonio campus is scheduled to support 1.5 million square feet of data center space with a $400M investment, supporting 200 MW at full build.

This first facility on the new campus, San Antonio III, is currently under construction for 300,000 initial square feet of turnkey data center space and an on-site 334 MW CPS substation.