Our Portfolio History
Developing data centers since 1999, we’ve built an impressive development track record in markets from coast to coast.
Stream has been developing data centers for Fortune 500 enterprises and hyperscalers since 1999. From greenfield builds to next-gen renovations of existing facilities, our data center development experience is unmatched in the industry.
Scroll down for a visual timeline of our data center history.

In Development
32 MW capacity at full build
View Data Center
Chicago II
Elk Grove Village, Illinois
- 32 MW capacity at full build
- Densities up to 60kW per cabinet
- Sales tax exemptions available
- 100% renewable energy options available
- Top-performing ComEd electric utility reliability
- All network distribution is 100% redundant
2021

Available
200 MW campus at full build
View Data Center
Phoenix I – V
Goodyear, Arizona
- 4.5 MW turnkey capacity immediately available
- Custom data center development options available across 157 acres
- Dedicated 350 MW APS substation
- Ability to deliver N+1 or 2N
- Renewable energy readily available
- Sales tax exemptions available
2019

Available
43 MW capacity at full build
View Data Center
DFW VII
Garland, Texas
- 43 MW capacity at full build
- Expanded 275K SF hyperscale facility on 23 acre site
- Two utility power feeds from 95 MW on-site Oncor substation
- Aggressive utility pricing (< 4.5 cents all-in)
- 100% renewable energy sourced in-state
- Sales tax exemptions available
- IEEE certified 99.9999% (six 9s) design
- Lower-risk North Dallas metro location (outside of the Eastern District of Texas)

Available
10.8 MW campus
View Data Center
San Antonio II – Westover Hills
San Antonio, Texas
- 800 kW turnkey capacity immediately available
- Three private 10,000 SF data halls with dedicated infrastructure
- Low-cost power
- Reliable power and fiber infrastructure
- Low risk of natural disaster
- Uptime Tier III Design Certified
2014

Available
7.2 MW capacity at full build
View Data Center
Minneapolis I
Chaska, Minnesota
- 7.2 MW capacity at full build
- Turnkey capacity immediately available
- Private data halls provide dedicated infrastructure
- Sales tax exemptions available (including electricity)
- 2N topology and 185 MPH wind rating
- Dual utility feeds from two different substations
- Uptime Tier III Design and LEED Silver Certified

Available
7.8 MW campus
View Data Center
Houston I – The Woodlands
The Woodlands, Texas
- 1.1 MW turnkey capacity immediately available
- Three private 10,000 SF data halls with dedicated infrastructure
- The Houston market’s most resilient data center (100% uptime since 2013)
- Uninterrupted by Hurricane Harvey, Winter Storm Uri
- 2N topology and 185 MPH wind rating
- Densities >30 kW per cabinet
2013
Stream launches wholesale adaptable turnkey colocation service
Learn MoreWe believe that procuring, deploying and operating
data center capacity should be a great experience.
In our 23rd year, with a successful track record of 24 data center projects in our past and present portfolio, Stream is proud to offer immediate data center availability in major US markets. Learn more here about our spacious hyperscale campus availability in Phoenix, Dallas and Chicago II, as well as enterprise data center space in Houston and Minneapolis.